The 6.3v 2200uFs are due 9/6/2010, you can use the KZE 6.3v 2200uFs in their place, they are 5mm taller but still fit without a problem. 6.3MCZ2200M10X20 current factory ship date 9/6/2010. Apparently the lead time on this item has gone from 18-20 weeks to 36 weeks. Also there is a huge OEM that uses this part and from what I'm told they basically get first crack at these parts. The factory is seeing if anything can be done to get them any sooner. Thanks, Troy

Rubycon MCZ 2200uF 6.3v 10mm
Rubycon MCZ 2200uF 6.3v 10mm
Item# 632200MCZ
$0.45, 200/$80.00

Product Description

Rubycon part number: 6.3MCZ2200M10X20

Rated Voltage: 6.3v

Rated Capacitance: 2200uF

Capacitance Tolerance: 20%

Temperature Range: -40 to 105C

Rated Ripple Current: 2770

ESR: 11

Diameter: 10mm

Height: 20mm